-
University of Hartford
Hartford, CT | 1980s to present- Dozens of projects over the past five decades, many in a design build capacity
- Hawks Nest Dining Hall Renovations - 2014
- Barney School of Business - Auerbach Hall Renovations - 2014
- Gengras Student Union - 2018 CT ABC Excellence in Construction Merit Award
- Hursey Center for Advanced Engineering and Health Professions - 2020
- Dana Hall Renovations - 2021
- Energy Savings Agreement campus wide infrastructure upgrades - 2021
-
Westminster School
Simsbury, CT | 2000s to present- Over a dozen projects spanning the past three decades, many in a design assist capacity
- First large new construction project was the Athletic Center in 2002
- Installed 72 geothermal wells for the Academic Center in 2009
- Expanded campus geothermal system by 29 wells for the Dining Hall in 2016
-
Yale University
New Haven, CT | 2010 to present- Dozens of projects spanning the past decade at the School of Medicine, School of Engineering and Applied Science, and West Campus
- Sterling Memorial Library Tech Services Renovation 2013
- Lauder LH4 Neurosurgery Lab Renovation 2019
- 2 Science Park Building Upgrades and Office Renovation 2020
- 300 George Street 6th Floor Lab Renovation 2021
-
Belimo Americas Expansion Project
Danbury, CT | 2013 to 2014- New 200,000 square foot headquarters including warehouse, office, and laboratory space
- Showcase for Belimo pressure independent Energy Valves and 6-way control valves
- Approximately 50,000 feet of piping installed between Plumbing and HVAC trades
-
Seabury Retirement Community
Bloomfield, CT | 2015 to 2018- Three major phases spanning nearly 5 years and multiple general contractors
- Over 175,000 square feet of new construction and 165,000 square feet of renovations
- Over 250 water source heat pumps installed with new campus condenser water system
- Designed, installed, and commissioned a hybrid geothermal system
- Retrofitted campus with redundant heating, free cooling, and energy saving controls
-
St. Francis Hospital Data Center
Hartford, CT | 2015 to 2016- 2017 CT ABC Excellence in Construction – Renovation Best in Show award winner
- 2016 Design-Build Institute of America – New England Region Silver award winner
- Design-build Tier III Data Center with N+1 redundancy for all mechanical components
- Heat generated by computer racks is recycled to heat the adjacent offices
- Emergency make-up water and flood control systems to meet FM Global requirements
-
Lighthouse Surgery Center
Hartford, CT | 2018-2019- 2020 CT ABC Excellence in Construction – Healthcare First Place award winner
- Design-assist role for new 35,000 square foot freestanding outpatient surgery center
- HVAC, plumbing, and medical gas systems to serve 6 operating rooms and on-site sterile processing
Ongoing projects
2021-12-09 00:44:48
19
19
High Watch Recovery Center Additions and Renovations
High Watch Recovery Center Additions and Renovations2021-12-09 00:54:16
20
20